翻訳と辞書
Words near each other
・ Patrikeya
・ Patriki
・ Patrilineality
・ Patrilocal residence
・ Patrimoine Ferroviaire et Tourisme
・ Patrimoni Cultural
・ Patrimonialism
・ Patrimonio
・ Patrimonio histórico español
・ Patrimonio Nacional
・ Patrimonium Sancti Petri
・ Patrimony
・ Patrimony (novel)
・ Patrimony of affectation
・ Patrina loukoumia
Patrind Hydropower Plant
・ Patrington
・ Patrington Haven
・ Patrington railway station
・ Patrington Rural District
・ Patrini
・ Patrinia
・ Patrinia olive
・ Patrinoti
・ Patriocetus
・ Patriofelis
・ Patriot
・ Patriot (American Revolution)
・ Patriot (comics)
・ Patriot (Spanish American Independence)


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Patrind Hydropower Plant : ウィキペディア英語版
Patrind Hydropower Plant

Patrind Hydropower Plant is a run-of-the-river, high head project of , located on Kunhar River near Patrind Village right on the border of Abbottabad District of Khyber Pakhtunkhwa Province and Muzaffarabad city of Azad Kashmir, Pakistan. It is approximately from Rawalpindi and Islamabad and about from Abbottabad city.〔http://www.wapda.gov.pk/pdf/allai13.pdf〕〔http://www.patrind.com/index.php?func=page&page_id=3〕
==Design and construction==
The Korean construction company Star Hydro Power Limited (SHPL), an Independent Power Producer (IPP), is setting up the Patrind Hydropower Plant, which will be the second private hydro power project in Pakistan.〔http://www.aaj.tv/2013/07/pm-to-groundbreak-147mw-patrind-hydropower-project-on-aug-15/〕〔http://www.patrind.com/〕〔http://www.wapda.gov.pk/pdf/BroHydpwrPotialApril2011.pdf〕 Project is being financed by IFC, ADB and K-Exim Bank. The company will complete the project in a period of three-and-a-half years at an estimated cost of $400 million. The project would generate 150 megawatts of electricity which would not only help improve the electricity voltage in Abbottabad and Mansehra districts but also boost economic activities in the region.〔http://tribune.com.pk/story/293717/patrind-hydropower-project-korean-company-acquires-land-for-ajk-power-project/〕
Since the project is being developed by SHPL as an IPP, the SHPL has entered into a 30-year Power Purchase Agreement with National Transmission and Dispatch Company (NTDC), Pakistan's grid system operator, for the sale of electricity generated from the Project.〔http://www.brecorder.com/pakistan/industries-a-sectors/170015-147mw-capacity-patrind-hydropower-project-to-be-completed-in-2017.html〕
The first independent hydro power project in the private sector – New Bong Escape Hydropower Project of 84MW – has already been completed and started commercial operation on March 2013.〔http://www.aaj.tv/2013/07/pm-to-groundbreak-147mw-patrind-hydropower-project-on-aug-15/〕
The total electricity generation capacity of the Patrind Hydropower Plant is 150 MW.〔http://www.wapda.gov.pk/htmls/allaikpj.html〕〔http://www.patrind.com/index.php?func=page&page_id=3〕 A surface type powerhouse to accommodate three Vertical Francis Turbine Units, each of 50 MW capacity, is proposed on the right bank of Jehlum River. The powerhouse site is about upstream of the Kunhar – Jhelum confluence. The crest elevation is 757 m which is approximately 26m high from the river bed. There will be four radial type crest gates each in size.〔http://www.patrind.com/index.php?func=page&page_id=3〕

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Patrind Hydropower Plant」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.